Trans-Alaska Pipeline Begun (1975)

One of America’s most ambitious projects—economic and environmental—began on March 27, 1975, when the first pipe was laid for what would become the Trans Alaska Pipeline.  After years of debate about the value and possible impact of the pipeline, the outcome has been remarkably positive.

            Oil was discovered in the far north of Alaska in March,1968.  The location was Prudhoe Bay, adjacent to the northern shore of Alaska, 100 miles above the Arctic Circle.  The find turned out to be the largest oil field ever discovered in the United States, estimated at the time to contain about 10 billion barrels of recoverable oil. 

            The problem, of course, was how to get the oil from the North Slope of Alaska to the rest of the country.  The sea was frozen for much of the year, preventing oil tankers from carrying the oil to other locations.  The solution was to build a pipeline to the nearest port that was ice-free all year long.  That port was at Valdez, Alaska, on the state’s southern shore, 800 miles from the oil field.

Route of the Trans-Alaska Pipeline; “PS” refers to pumping stations (figure by Flominator)

            Distance wasn’t the only problem.  A pipeline from Prudhoe Bay to Valdez would need to cross three mountain ranges, span 34 major rivers and 700 smaller streams.  It would pass through a major earthquake zone—and Alaska was known for its severe earthquakes.  Temperature extremes were brutal, from frigid cold to blistering heat.  The route also passed through “permafrost,” the permanently frozen ground that would melt if it was disturbed, breaking a buried pipeline.  

            There were also major issues of land ownership, involving Native Americans in Alaska and state versus federal land holdings.  And at just about the same time, the National Environmental Policy Act was being passed, requiring impacts statements about a place that was poorly known and a project of a type and scale that had never been tried before.

            Amidst all these issues, however, the oil producing countries of the Middle East slapped an embargo on oil exported to the United States.  Oil supplies dropped, causing prices to rise and shortages to affect the lives of every American (read about the oil embargo here) .  Faced with the possibility of no gas for cars, the federal government quickly responded, solving Native American land issues, environmental processes and other impediments and approving the “Trans-Alaska Pipeline Authorization Act” in 1973.

An elevated section of the pipeline, which protects the permafrost soil below the pipe (photo by Ryan McFarland)

            And, so, on March 27, 1975, the first section of pipe was welded into place. The pipeline was finished on May 31, 1977—with a “golden weld” reminiscent of the golden spike that completed the trans-continental railroad a century earlier (read about the golden spike here).  It has proven to be an engineering masterpiece.  Of the 800 miles, about half are buried, in the normal style of pipelines.  The other half of the pipeline, however, could not be buried because of permafrost.  Instead, the pipe is suspended on masts that hold it several feet above ground.  The masts are called “vertical support members,” or VSMs.  Invented for this purpose, they contain liquid that transfers heat from the masts and the adjacent ground, keeping the permafrost frozen and the pipe securely mounted.

            The pipe itself sits loosely on the supports, so that it can move with changes in the local topography.  The path is a zigzag, which allows the pipeline to move more extensively during earthquakes, without rupturing.  Although Alaska has experienced many earthquakes during the 40-year life of the pipeline, no earthquake related leaks have occurred.

Alaskan caribou (photo by Dean Biggins, U.S. Fish and Wildlife Service)

            When the pipeline was planned, the impact on caribou was a major concern.  Some predicted that caribou would not cross the pipeline, either by passing under it or going over it where passages were provided, causing disruption of breeding and decline of the populations.  Happily, caribou have proven quite resilient.  The population most likely to be affected, the Central Arctic Herd, had about 5,000 animals in the mid-1970s.  It has grown steadily, reached more than 70,000 in the early 2000s and now numbering about 25,000 (all caribou populations in Alaska have undergone large fluctuations in abundance in this century.

            In general, the environmental impacts of the Trans Alaska Pipeline have been minimal, especially when the massive nature of the project is considered.  The pipeline has carried 17 billion barrels of oil over its life, an average of 1.8 million barrels per day.  At one time, the pipeline produced 20% of America’s domestic oil supply.  Sometimes, the system gets it right.

References:

Alyeska Pipeline.  Pipeline Facts.  Available at:  https://www.alyeska-pipe.com/TAPS/PipelineFacts.  Accessed March 25, 2019.

American Oil & Gas Historical Society.  Trans-Alaska Pipeline History.  Available at:  https://aoghs.org/transportation/trans-alaska-pipeline/.  Accessed March 25, 2019.

Circum Arctic Rangifer Monitoring and Assessment Network.  Central Arctic Herd.  Available at:  https://carma.caff.is/herds/538-carma/herds/589-central-arctic.  Accessed March 25, 2019.

Hobson, Margaret Kriz.  2017.  How Spiro Agnew helped save the Trans-Alaska project.  E&E News, August 8, 2017.  Available at:  https://www.eenews.net/stories/1060058484.  Accessed March 25, 2019.

This Month in Conservation

August 1
Hawaii National Park Created (1916)
August 2
White Giraffes Found in Kenya (2017)
August 3
Arbor Day in Niger
August 4
Liang Congjie, Pioneering Chinese Environmentalist, born (1932)
August 5
First Traffic Light Installed in U.S. (1914)
August 6
Rajendra Singh, the Waterman of India, Born (1959)
August 6
Michael Regan, EPA Administrator, Born (1976)
August 7
World’s Oldest Tree Cut Down, Accidentally (1964)
August 7
Elinor Ostrom, Noble Laureate in Economics, Born (1933)
August 8
Banqiao Dam Collapse, World’s Biggest Dam Disaster (1975)
August 9
Smokey Bear Born (1944)
August 10
John Kirk Townsend, Pioneering Naturalist, Born (1809)
August 11
Gifford Pinchot, Father of American Forestry, Born (1865)
August 12
“The Lorax” Published (1971)
August 13
Roald Amundsen Completes Northwest Passage (1905-1906)
August 14
Hetch Hetchy Began Producing Power (1925)
August 15
Sponge Act passed (1914)
August 16
E. F. Schumacher, Environmental Economist, born (1911)
August 17
Cape Hatteras National Seashore created (1937)
August 18
Margaret Murie born (1902)
August 19
Cickamauga and Chattanooga Battlefield established
August 20
The Great Fire (1910)
August 20
Rajendra Pachauri, Nobel Peace Laureate in Climate Change Research, Born (1940)
August 21
“Bambi” Released (1942)
August 22
Loch Ness Monster first seen (565)
August 23
Chile’s Atacama Desert Blooms (2017)
August 24
Katahdin Woods and Waters National Monument, Maine, Established (2016)
August 25
National Park Service Born (1916)
August 26
Krakatau Volcano Erupted (1883)
August 27
First Oil Well Drilled (1859)
August 28
Roger Tory Peterson, Ornithologist, Born (1908)
August 29
Henry Bergh, Founder of ASPCA, Born (1813)
August 30
Lord Walsingham Shot 1,070 Grouse (1888)
August 30
International Whale Shark Day
August 31
John Muir Home preserved (1964)
January February March April May June July August September October November December